[{"id":293996593349,"handle":"best-selling-collection","title":"Best selling products","updated_at":"2025-01-21T21:10:05+10:00","body_html":null,"published_at":"2023-09-30T12:52:33+10:00","sort_order":"best-selling","template_suffix":null,"disjunctive":false,"rules":[{"column":"variant_price","relation":"greater_than","condition":"0"}],"published_scope":"web"},{"id":282559217861,"handle":"butterfly-ballet","updated_at":"2025-01-21T18:50:02+10:00","published_at":"2021-12-14T17:23:00+10:00","sort_order":"manual","template_suffix":"","published_scope":"web","title":"Butterfly Ballet","body_html":"","image":{"created_at":"2024-10-16T14:34:57+10:00","alt":"patterned dog collars, dog harnesses, dog leads, dog bow ties","width":84,"height":79,"src":"\/\/www.dizzydogcollars.com\/cdn\/shop\/collections\/dog-harness-butterfly-183577.jpg?v=1729053298"}},{"id":299844042949,"handle":"christmas-2022","title":"Christmas 2022","updated_at":"2025-01-21T21:10:05+10:00","body_html":"","published_at":"2024-02-22T14:25:56+10:00","sort_order":"best-selling","template_suffix":"","disjunctive":false,"rules":[{"column":"vendor","relation":"equals","condition":"Dizzy Dog Collars"}],"published_scope":"web"},{"id":150130557033,"handle":"dog-collars-leads","updated_at":"2025-01-21T20:55:03+10:00","published_at":"2019-09-25T07:24:40+10:00","sort_order":"manual","template_suffix":"","published_scope":"web","title":"Dog Collars \u0026 Leads","body_html":"\u003cmeta charset=\"utf-8\"\u003e\n\u003cp\u003eOur dog collars and dog leads have been designed for comfort, with either a neoprene lining, or a strong, yet soft high quality pet industry nylon. Our unique prints are either printed onto a polyester webbing, or woven using the highest quality materials. All our collars are highly adjustable. \u003c\/p\u003e\n\u003cdiv\u003e\n\u003cspan\u003e\u003c\/span\u003e\u003cbr\u003e\n\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cbr\u003e\u003cspan\u003e\u003c\/span\u003e\n\u003c\/div\u003e","image":{"created_at":"2024-10-16T14:35:33+10:00","alt":"DOG COLLARS AND DOG LEADS AUSTRALIA","width":2048,"height":2048,"src":"\/\/www.dizzydogcollars.com\/cdn\/shop\/collections\/collars_and_leads_collection_6aa6ffed-ff05-4e4d-8171-d9b2e9ab70a9-647492.jpg?v=1729053334"}},{"id":394155666,"handle":"leads-1","updated_at":"2025-01-21T20:55:03+10:00","published_at":"2017-07-05T20:03:51+10:00","sort_order":"manual","template_suffix":"","published_scope":"web","title":"Dog Leashes \u0026 Leads","body_html":"\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cmeta charset=\"utf-8\"\u003e\n\u003ch2\u003e\u003cstrong\u003eDIZZY DOG COLLARS DOG LEASH \u0026amp; DOG LEADS\u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp\u003efor dogs and cats. Dog leashes designed with style and comfort in mind. Our range of leashes feature either a custom printed dual sided polyester with neoprene handle, or a beautifully woven fabric layered onto a soft, yet strong nylon. \u003c\/p\u003e\n\u003cdiv class=\"rte rte--header\"\u003e\n\u003cdiv\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003c\/div\u003e","image":{"created_at":"2024-10-16T14:35:36+10:00","alt":"dog leads australia, dog leashes and leads bright blue dog leash handmade in Australia","width":600,"height":600,"src":"\/\/www.dizzydogcollars.com\/cdn\/shop\/collections\/tat_lead_square_76846fd7-e7a2-4cbe-b417-fd63d174267c-765421.jpg?v=1729053337"}},{"id":291473457349,"handle":"double-ended-leads","updated_at":"2025-01-09T08:35:07+10:00","published_at":"2022-12-04T11:17:19+10:00","sort_order":"best-selling","template_suffix":"","published_scope":"web","title":"Double Ended Leads | Hands Free Lead","body_html":"","image":{"created_at":"2024-10-16T14:35:42+10:00","alt":null,"width":2048,"height":2048,"src":"\/\/www.dizzydogcollars.com\/cdn\/shop\/collections\/HANDS-FREE-LEAD-GALAXY-1-995500.jpg?v=1729053342"}},{"id":312565432517,"handle":"for-the-boys","title":"For The Boys","updated_at":"2025-01-21T19:00:05+10:00","body_html":"","published_at":"2024-11-09T12:12:43+10:00","sort_order":"manual","template_suffix":"","disjunctive":true,"rules":[{"column":"title","relation":"contains","condition":"vintage gingham"},{"column":"title","relation":"contains","condition":"olive gingham"},{"column":"title","relation":"contains","condition":"blue marble"},{"column":"title","relation":"contains","condition":"red and blue gingham"},{"column":"title","relation":"contains","condition":"country plaid"},{"column":"title","relation":"contains","condition":"christmas plaid"},{"column":"title","relation":"contains","condition":"the hamish"},{"column":"title","relation":"contains","condition":"aztec empire"},{"column":"title","relation":"contains","condition":"navy gingham"},{"column":"title","relation":"contains","condition":"little lou"},{"column":"title","relation":"contains","condition":"christmas koalas"},{"column":"title","relation":"contains","condition":"stardust"},{"column":"title","relation":"contains","condition":"wish upon a genie"},{"column":"title","relation":"contains","condition":"butterfly ballet"},{"column":"title","relation":"contains","condition":"midnight cherry"},{"column":"title","relation":"contains","condition":"red \u0026 blue gingham"}],"published_scope":"web"},{"id":305720230085,"handle":"hands-free-leads-long-leads","title":"Hands Free Leads \u0026 Long Leads","updated_at":"2025-01-21T07:48:13+10:00","body_html":"\u003cp\u003eDiscover freedom and convenience with our range of hands-free dog leads and long 2.1m leads. Designed for active lifestyles, these products offer you the flexibility to enjoy walks and adventures with your dog, whether you're hiking, jogging, or simply exploring the neighborhood. Crafted with durability and comfort in mind, our leads ensure both you and your furry companion can move freely while maintaining control and safety. Choose from a variety of styles and colors to suit your needs and enhance your outdoor experience with your beloved pet.\u003c\/p\u003e\n\u003c!----\u003e","published_at":"2024-06-15T13:00:59+10:00","sort_order":"manual","template_suffix":"","disjunctive":true,"rules":[{"column":"title","relation":"contains","condition":"hands free"},{"column":"title","relation":"contains","condition":"long lead"}],"published_scope":"web","image":{"created_at":"2024-10-16T14:35:20+10:00","alt":"Hands Free Leads \u0026 Long Leads - Dizzy Dog Collars ","width":2048,"height":2048,"src":"\/\/www.dizzydogcollars.com\/cdn\/shop\/collections\/double-ended-training-lead-hands-free-crossbody-dog-lead-the-coco-hands-free-dizzy-dog-collars-708012.jpg?v=1729053321"}},{"id":167760625769,"handle":"pre-made-martingales-and-leads","updated_at":"2025-01-21T18:25:03+10:00","published_at":"2020-05-26T20:10:16+10:00","sort_order":"manual","template_suffix":"","published_scope":"web","title":"Martingale Dog Collars","body_html":"\u003cmeta charset=\"utf-8\"\u003e\u003cem data-mce-fragment=\"1\"\u003eA martingale collar is made with two loops. The larger loop is slipped onto the dogs neck and a lead is then clipped to the smaller loop. When the dog tries to pull, the tension on the lead pulls the small loop taut, which makes the large loop smaller and tighter on the neck, thus preventing escape.\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003eProperly fitted, the collar will be comfortably loose whenever the dog is not pulling against the leash.\u003c\/em\u003e\u003cspan data-mce-fragment=\"1\"\u003e\u003c\/span\u003e\n\u003ch6 data-mce-fragment=\"1\"\u003e\u003cem data-mce-fragment=\"1\"\u003e\u003ca href=\"https:\/\/en.wikipedia.org\/wiki\/Martingale_(collar)\" title=\"what is a martingale collar\" data-mce-fragment=\"1\" data-mce-href=\"https:\/\/en.wikipedia.org\/wiki\/Martingale_(collar)\"\u003e\u003cspan data-mce-fragment=\"1\"\u003e(1)\u003c\/span\u003e\u003c\/a\u003e\u003c\/em\u003e\u003c\/h6\u003e","image":{"created_at":"2024-10-16T14:36:13+10:00","alt":"martingale dog collars, sighthound dog collars","width":2048,"height":2048,"src":"\/\/www.dizzydogcollars.com\/cdn\/shop\/collections\/martingale_sqaure-883270.jpg?v=1729053374"}},{"id":293996560581,"handle":"new-collection","title":"New products","updated_at":"2025-01-21T21:10:05+10:00","body_html":null,"published_at":"2023-09-30T12:52:32+10:00","sort_order":"created-desc","template_suffix":null,"disjunctive":false,"rules":[{"column":"variant_price","relation":"greater_than","condition":"0"}],"published_scope":"web"},{"id":315154694341,"handle":"quick-order","title":"Quick Order","updated_at":"2025-01-21T21:10:05+10:00","body_html":null,"published_at":"2025-01-06T17:55:16+10:00","sort_order":"best-selling","template_suffix":"quick","disjunctive":false,"rules":[{"column":"variant_price","relation":"greater_than","condition":"0"}],"published_scope":"web"},{"id":28648800284,"handle":"neoprene-sets","updated_at":"2025-01-21T21:10:05+10:00","published_at":"2019-09-01T07:34:33+10:00","sort_order":"manual","template_suffix":"","published_scope":"web","title":"SHOP ALL","body_html":"This section is a combination of handmade and manufactured items, which are pre-made, and are not subject to our production time. If purchasing with a handmade item, the production time will still be applicable.","image":{"created_at":"2024-10-16T14:37:08+10:00","alt":"DOG COLLARS AND DOG LEADS AUSTRALIA","width":1333,"height":1333,"src":"\/\/www.dizzydogcollars.com\/cdn\/shop\/collections\/shot_spets_def04340-5c85-4e9b-92a0-fb69e4219838-665741.jpg?v=1729053428"}}]
Double Ended Training Lead |Hands Free - Crossbody Dog Lead | Butterfly Ballet
73 reviews
Regular price$39.37
/
Tax included.
This double-ended dog leash can be used in a variety of ways. It has two snap hooks and fourD-Rings so it can be used as a short or long leash, over the shoulder or around the waist.
The premium padded length provides maximum comfort for the handler.
The full length is 2.1m with a strong snap hook on each end and 4x D-Rings along the lead’s length. The entire leash is padded with neoprene for your comfort.
The lead length is adjustable and can also be used as a temporary tether.
A kaleidoscope of delightful blue and purple butterflies taking flight. Our Butterfly Ballet pattern is vibrant and pretty, bringing a touch of happiness and beauty to your day!
Love, love, love! Such a vibrant and fun print, carries my phone and dog treats easily, plus doggy bags. Fast delivery, can’t recommend enough! Thank you Dizzy Dog Collars!
N
Naomi F.
A high quality, useful product. Makes walking with my pooch so much more enjoyable. Was so impressed with the Adventure Pouch that I purchased one for my sister.
K
Katherine J.
This matching bag has been a god send in helping me train my puppy. The treats are permanently on hand and it’s such a great size too.
E
Edwina M.
Love the bag and it looks so great with the matching set when I'm out with my Assistance Dog. It's not my first choice for layout, but I'm fussy because I constantly have a treat bag attached to me. Love they style for short/familiar outings where I'm not using many reinforcers or don't need a "place" mat with me ❤️🐕🦺